Navy To Host Virtual Public Meeting On Proposed New Drydock At Pearl Harbor
2/14/2022: The U.S. Navy has opened the public comment period on a Draft Environmental Impact Statement to evaluate the potential environmental impacts associated with construction and operation of a new dry dock and waterfront production facility at Pearl Harbor Naval Shipyard. Dry Dock No. 3 at Pearl Harbor, 1998 David Franzen. The proposed project is located within the Pearl Harbor National Historic Landmark and would demolish historic buildings, the World War II-era Dry Dock 3 and many historic site features and view sheds—and would have impacts on important view sheds—all of which contribute to the historic significance of the NHL. Historic Hawai‘i Foundation is participating the National Historic Preservation Action Section 106 consultation to assess and help resolve effects on historic and cultural properties. In addition to the Section 106 consultation, Navy is engaged in the review of the potential environmental impacts of the proposed project and has invited public comment on the Draft EIS. The Navy will host a public meeting on February 24. Written comments on the draft EIS are due by March 21. The Draft EIS and additional information are available at https://www.pearlharbordrydockeis.org. Proposed Action The U.S. Department of the Navy (Navy) proposes to construct and operate a graving dry dock and waterfront production facility at Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNSY & IMF), including auxiliary facilities containing equipment used to operate the dry dock, such as pump stations, water treatment system, parking lots, crane maintenance area, power, and utilities. PHNSY & IMF is located at Joint Base Pearl Harbor-Hickam (JBPHH), O‘ahu, Hawai‘i. The graving dry dock would replace existing Dry Dock 3 and would be given a new dry dock number (Dry Dock 5) because it [...]